Contract 73548 REL 134: 1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
Project Number:
Title:
Lake Roosevelt Rainbow Trout Habitat and Passage Improvement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Sanpoil 100.00%
Contract Number:
73548 REL 134
Contract Title:
1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
Contract Continuation:
Previous: Next:
73548 REL 104: 1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
  • 91814: 1990-018-00 EXP RAINBOW TROUT HABITAT/PASSAGE IMPROVEMENT
Contract Status:
Closed
Contract Description:
The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a resident fish substitution project intended to mitigate for anadromous fish losses caused by the construction and operations of Chief Joseph and Grand Coulee Dams.  The goal is to restore healthy and harvestable salmonid populations through rehabilitation of stream habitat and restoration of ecological function in the riparian corridors of streams within the boundaries of the Colville Confederated Tribes Reservation and Traditional Territories.

The Project proposes to enhance natural production and survival of resident fish for recreation and Tribal subsistence with the implementation of several management actions designed to address habitat related limiting factors and restore the natural hydrologic function of the systems.  In 2011, the project adopted an updated habitat improvement and protection strategy that focused on process-based restoration of natural stream function and a clearly-defined, hierarchical prioritization and implementation strategy to guide improvement actions.

The results of EDT modelling and restoration plan development identified 25 priority reaches to focus our efforts in and concluded that the most common restoration measures suggested for these priority reaches were: additions of large wood to the channel, riparian restoration, livestock exclusion, floodplain reconnections, remeandering straightened channels, wetland restoration, barrier removal, and protection.

The habitat restoration actions will improve the quality and quantity of stream habitat for native fishes.  These actions are designed to increase the abundance of native fish, primarily Redband Trout, to support ecosystem health and harvest opportunities.

We will begin working toward implementation of actions identified in the plan, as well as complete and maintain restoration identified in previous years.  

Work under this contract cycle will include:
•    Maintenance of approximately 16.19 miles of existing riparian fence
•    Monitor exclosures
•    Maintain BDAs at two sites; Lost-Loony creeks and Moses Creek #1
•    Maintain riparian plantings at two sites; Lost-Loony creeks and Moses Creek #1
•    Design and implement BDAs at two sites; Moses Creek #2 and Twentythree Mile Creek
•    Design LWD placement at two sites for implementation in FY23; Sanpoil-4B and Sanpoil-4A
•    Design fish passage structures at two sites for implementation in FY23; Lower Gold Creek and Lost Creek
•    Planning, update habitat restoration and protection plan and adaptive management
Account Type(s):
Expense
Contract Start Date:
02/01/2022
Contract End Date:
01/31/2023
Current Contract Value:
$566,987
Expenditures:
$566,987

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance A: 165. Complete Environmental Compliance 01/31/2023 01/31/2023
Develop or update (out-year) prioritized Habitat Project list: upload final draft to Pisces B: 114. Identify and Select Projects for the Upper Columbia and Sanpoil Habitat Restoration Plan (WE-C in FY21) 01/31/2023 01/31/2023
Provide technical review and recommendation C: 122. Interdisciplinary Project Planning Participation - Technical Review (WE-D in FY21) 01/31/2023 01/31/2023
Functioning riparian fencing D: 186. Maintain Existing Riparian Fence (WE-E in FY21) 01/31/2023 01/31/2023
Sanpoil and Upper Columbia subbasins riparian protection exclosures monitored E: 26. Monitor Exclosures (WE-F in FY21) 01/31/2023 01/31/2023
Functioning instream structures (BDAs and PALS) F: 186. Lost-Loony Creek BDA Maintenance (WE-I in FY21) 01/31/2023 01/31/2023
Riparian vegetation maintained at Lost-Loony Creek G: 198. Maintain Riparian Plantings at Lost-Loony Creek (WE-H in FY21) 10/31/2022 10/31/2022
Functioning instream structures (BDAs and PALS) H: 186. Moses Creek BDA Maintenance (WE-J in FY21) 01/31/2023 01/31/2023
Design plan set for Sanpoil River (Sanpoil-4B) large wood addition I: 175. Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4B)- Large Wood Placement (WE-M in FY21) 01/31/2023
Design plan set for Sanpoil River (Sanpoil-4A) large wood addition J: 175. Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4A)- Large Wood Placement (WE-M in FY21) 01/31/2023
Updated habitat restoration and protection plan prioritization K: 174. Update Habitat Restoration and Protection Plan Prioritization and Adaptive Management (WE-N in FY21) 01/31/2023 01/31/2023
Riparian vegetation maintained at Lost-Loony Creek L: 198. Maintain Riparian Plantings at Moses Creek - New 01/31/2023 01/31/2023
Design specifications and site plan M: 175. Moses Creek Site #2 BDA Design - New 01/31/2023
Improved habitat function, complexity and structure: installed BDAs functioning as designed in Moses Creek #2 site N: 29. Moses Creek Site #2 BDA Installation - New 01/31/2023
Design specifications and site plan O: 175. Twentythree Mile Creek BDA Design - New 01/31/2023
Improved habitat function, complexity and structure: installed BDAs functioning as designed in Twentythree Mile Creek P: 29. Twentythree Mile Creek BDA Installation - New 01/31/2023
Completed designs for fish passage on Gold Creek Q: 175. Replacement of Forest Road Crossing over Lower Gold Creek - New 01/31/2023
Completed designs for fish passage on Lost Creek R: 175. Replacement of Forest Road Crossing over Lost Creek - New 01/31/2023
Completed Annual Report T: 132. Submit Progress Report for the Period (Jan 2021) to (Dec 2021) 06/15/2022 05/25/2022
Funding package submitted U: 119. Manage & Administer the Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project 01/31/2023 01/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Interior Redband (O. mykiss gairdnerii)
  • 2 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 6 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Environmental Compliance
B 114 Identify and Select Projects for the Upper Columbia and Sanpoil Habitat Restoration Plan (WE-C in FY21)
C 122 Interdisciplinary Project Planning Participation - Technical Review (WE-D in FY21)
D 186 Maintain Existing Riparian Fence (WE-E in FY21) 02/18/2022
E 26 Monitor Exclosures (WE-F in FY21)
F 186 Lost-Loony Creek BDA Maintenance (WE-I in FY21) 02/18/2022
G 198 Maintain Riparian Plantings at Lost-Loony Creek (WE-H in FY21) 02/18/2022
H 186 Moses Creek BDA Maintenance (WE-J in FY21) 02/18/2022
I 175 Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4B)- Large Wood Placement (WE-M in FY21) 02/18/2022
J 175 Design Specifications & Engineering: Middle Sanpoil River (Sanpoil-4A)- Large Wood Placement (WE-M in FY21) 02/18/2022
K 174 Update Habitat Restoration and Protection Plan Prioritization and Adaptive Management (WE-N in FY21) 02/18/2022
L 198 Maintain Riparian Plantings at Moses Creek - New 02/18/2022
M 175 Moses Creek Site #2 BDA Design - New 02/18/2022
N 29 Moses Creek Site #2 BDA Installation - New
O 175 Twentythree Mile Creek BDA Design - New 02/18/2022
P 29 Twentythree Mile Creek BDA Installation - New
Q 175 Replacement of Forest Road Crossing over Lower Gold Creek - New 02/18/2022
R 175 Replacement of Forest Road Crossing over Lost Creek - New 02/18/2022
S 185 Periodic Status Reports for BPA
T 132 Submit Progress Report for the Period (Jan 2021) to (Dec 2021)
U 119 Manage & Administer the Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project